NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Sequoyah Nuclear Plant Unit 2 Cycle 5 Insp,Apr 1992,SG Tubing Insp Results." Five tubes plugged in SG 1,19 tubes plugged in SG 2,12 tubes plugged in SG 3 & 2 tubes plugged in SG 4.

Accession Number: ML20035D613

Date Released: Tuesday, December 1, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer