NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards application for amend to License NPF-69,revising TS Section 3/4.1.3.5, "Control Rod Scram Accumulators" to allow reactor operator 20 minutes to restart at least one CRD pump provided reactor pressure plus or minus 900 psig.

Accession Number: ML20035D536

Date Released: Tuesday, December 1, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer