The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20031C860 - La Crosse Boiling Water Reactor Submittal of Final Status Survey Final Report - Phase 3. (9 page(s), 1/28/2020)
- ML20031C858 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3. (61 page(s), 1/28/2020)
- ML20031C840 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-010-101 Reactor Building, WTB, WGTV, Ventilation Stack Grounds (Release Record) (281 page(s), 1/28/2020)
- ML20031C841 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-010-102 Turbine Building, Turbine Office Building, 1B Diesel Generator Building Grounds (283 page(s), 1/28/2020)
- ML20031C842 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-010-103 LSA Building, Maintenance Eat Shack Grounds (285 page(s), 1/28/2020)
- ML20031C843 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-010-104 North LSE Grounds (301 page(s), 1/28/2020)
- ML20031C844 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-010-105 North Interim Debris Storage Area (277 page(s), 1/28/2020)
- ML20031C845 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-010-106 North Loading Area (335 page(s), 1/28/2020)
- ML20031C846 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-010-107 Outside East LSE Area (322 page(s), 1/28/2020)
- ML20031C847 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L2-011-101 Area North of LSE Fence. (279 page(s), 1/28/2020)
- ML20031C849 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L2-011-104 G3 Crib House, Circ. Water Discharge Land (Release Record) (247 page(s), 1/28/2020)
- ML20031C850 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L3-012-101 North End of Licensed Site (Release Record) (283 page(s), 1/28/2020)
- ML20031C852 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L3-012-109 Plant Access, ISFSI Haul Road Grounds East (Release Record) (479 page(s), 1/28/2020)
- ML20031C853 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-SUB-CDR Stack, Pipe Tunnel, RPGPA Excavation (Release Record) (272 page(s), 1/28/2020)
- ML20031C855 - La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3, Survey Unit L1-SUB-TDS A Eastern Portion TB, SUMP, PIT, Diesel (Release Record) (341 page(s), 1/28/2020)