NRC Logo

Home > NRC Library > ADAMS Public Documents

Suggests closeout of Multi-Plant Action B-67 re pressurized thermal shock to reactor pressure vessels.Action Item B-72 should be developed instead.

Accession Number: ML20028G543

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer