Home > NRC Library > ADAMS Public Documents
Forwards "Test Rept for Proof Leak Testing of GPE Wetwell to Drywell Vacuum Breaker Valve," draft "Reanalysis of LaSalle Wetwell to Drywell Vacuum Breakers Under Pool Swell Loading Conditions" & four oversize drawings.Aperture cards in PDR.
Accession Number: ML20027D716
Date Released: Saturday, October 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20027D715 - Forwards "Test Rept for Proof Leak Testing of GPE Wetwell to Drywell Vacuum Breaker Valve," draft "Reanalysis of LaSalle Wetwell to Drywell Vacuum Breakers Under Pool Swell Loading Conditions" & four oversize drawings.Aperture cards in PDR. (3 page(s), 10/28/1982)
- ML20027D723 - "Test Rept for Proof & Leak Testing of GPE Wetwell to Drywell Vacuum Breaker Valve." (31 page(s), 10/26/1982)
- ML20027D724 - First draft "Reanalysis of LaSalle Wetwell to Drywell Vacuum Breakers Under Pool Swell Loading Conditions." (20 page(s), 10/31/1982)
- ML20027D725 - Revision 2 to "Test Spec for Proof & Leak Testing of GPE Wetwell-to-Drywell Vacuum Breaker Valve." (9 page(s), 10/26/1982)
- ML20027D728 - Revision 1 to "Test Plan & Procedure for Proof & Leak Testing of Wetwell to Drywell Vacuum Breaker Valve." (33 page(s), 10/26/1982)
- ML20263R917 - "Drywell/Wetwell Vacuum Breaker Valve Replacement Parts Fabrication Details." Sheet 1 of 1. (1 page(s), 10/20/1982)
- ML20263R926 - "Drywell/Wetwell Vacuum Breaker Valve Compression Ring Assembly Fabrication Details." Sheet 1 of 1. (1 page(s), 10/20/1982)
- ML20263R931 - "Drywell/Wetwell Vacuum Breaker Valve Replacement Parts Test Installation Drawing." Sheet 1 of 1. (1 page(s), 10/20/1982)
- ML20263R939 - "Drywell/Wetwell Vacuum Breaker Valve Replacement Parts Field Installation Drawing." Sheet 1 of 1. (1 page(s), 10/20/1982)