Forwards interim deficiency repts on Reportable Conditions 49 & 248 & final deficiency repts on Reportable Conditions 64 & 219.Next rept will be submitted by 831019.
Accession Number: ML20024D218
Date Released: Friday, February 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20024D217 - Forwards interim deficiency repts on Reportable Conditions 49 & 248 & final deficiency repts on Reportable Conditions 64 & 219.Next rept will be submitted by 831019. (1 page(s), 7/20/1983)
- ML20024D227 - Interim deficiency rept re Condition 49,operation of standby gas treatment sys damper.Circuits will be rerouted for various dampers on each unit.Engineering criteria document revised to identify sys requiring separation. (3 page(s), 7/20/1983)
- ML20024D232 - Final deficiency rept re Condition 64,plant electrical separation.Insp completed in Sept 1982.Engineering directives issued to correct deficiencies. (4 page(s), 7/20/1983)
- ML20024D239 - Final deficiency rept re Condition 219,inadequate assembly of sway strut/snubber end bushings,per IE Circular 81-05. Original installer of sway struts & snubbers no longer site contractor.Bechtel procedures developed. (4 page(s), 7/20/1983)
- ML20024D242 - Interim deficiency rept re Condition 248,Anaconda flexible conduit.Areas potentially experiencing high temp & concurrent steam environ surveyed.Internal water seal will be installed.Work will be completed before fuel load. (2 page(s), 7/20/1983)