Forwards backfit cost figures for addl seven utils per original 830208 request.Cost figures for 20 utils transmitted 830411.
Accession Number: ML20024B287
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20024B301 - Forwards backfit cost info for facility,per NRC 830208 request.Category 1 imposed by NRC regulations/orders, Category 2 imposed by NRC bulletins & NUREG-0737 requirements & Category 3 initiated by util. (5 page(s), 4/14/1983)
- ML20024B303 - Informs of inability to respond to NRC 830208 request re impact of regulatory backfit cost since util has no operating plant to use as baseline for comparison.Support expressed for backfit evaluation effort. (1 page(s), 4/8/1983)
- ML20024B304 - Forwards backfit & regulatory impact cost analysis for facility,per NRC 830208 request.Analysis,formerly confidential atty work product,released to intervenors & now to task force. (1 page(s), 6/1/1983)
- ML20024B306 - "Determining Portion of Regulatory Burden on Indian Point 3 Capital & O&M Expenditures 1976 - 1986:10-Yr Cost Projection Also Included." (36 page(s), 4/30/1983)
- ML20024B308 - Forwards backfitting cost info for facility,per NRC 830208 request. (7 page(s), 4/11/1983)
- ML20024B310 - Forwards backfit cost tabulations for facilities,per NRC 830208 request. (6 page(s), 5/4/1983)
- ML20024B312 - Forwards backfit cost estimates for facilities,per NRC 830315 ltr.Costs do not reflect extending scheduled outages due to backfits & mods. (5 page(s), 5/2/1983)