Home > NRC Library > ADAMS Public Documents
Forwards Startup Test Rept 2,consisting of test procedures re water level measurement,average power range monitor calibr,piping & recirculation sys.
Accession Number: ML20024B100
Date Released: Friday, February 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20024B099 - Forwards Startup Test Rept 2,consisting of test procedures re water level measurement,average power range monitor calibr,piping & recirculation sys. (2 page(s), 6/24/1983)
- ML20024B103 - "Startup Test Procedure 9,Water Level Measurement." (3 page(s), 6/24/1983)
- ML20024B104 - "Startup Test Procedure 12,Average Power Range Monitor Calibr." (1 page(s), 6/24/1983)
- ML20024B107 - "Startup Test Procedure 17,Sys Expansion." (2 page(s), 6/24/1983)
- ML20024B109 - "Startup Test Procedure 23A,Feedwater Control Sys." (2 page(s), 6/24/1983)
- ML20024B110 - "Startup Test Procedure 26,Relief Valves." (2 page(s), 6/24/1983)
- ML20024B111 - "Startup Test Procedure 29,Recirculation Flow Control Sys." (5 page(s), 6/24/1983)
- ML20024B112 - "Startup Test Procedure 30,Recirculation Sys." (2 page(s), 6/24/1983)
- ML20024B115 - "Startup Test Procedure 33,Drywell Piping Vibration." (1 page(s), 6/24/1983)
- ML20024B116 - "Startup Test Procedure 35,Recirculation Sys Flow Calibr." (1 page(s), 6/24/1983)
- ML20024B119 - "Startup Test Procedure 74,Offgas Sys." (2 page(s), 6/24/1983)