NRC Logo

Home > NRC Library > ADAMS Public Documents

Interim deficiency rept re failure of GE reactor mode switch to actuate reactor protection sys channel.Initially reported on 830407.Franklin Inst test & analysis rept on 830322 switch failure encl.Final rept for Unit 2 by 831001.

Accession Number: ML20023D164

Date Released: Thursday, February 6, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer