Home > NRC Library > ADAMS Public Documents
Forwards "Second 10-Yr Interval Pump & Valve Inservice Testing Program," per 10CFR50.55a(g)(5)(i).NRC approval of relief requests re specific requirements from Article IWV-1100 included in encl,requested by 900921.
Accession Number: ML20012E022
Date Released: Thursday, October 1, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20012E021 - Forwards "Second 10-Yr Interval Pump & Valve Inservice Testing Program," per 10CFR50.55a(g)(5)(i).NRC approval of relief requests re specific requirements from Article IWV-1100 included in encl,requested by 900921. (2 page(s), 3/22/1990)
- ML20261A481 - "PIPING & INSTRUMENT DIAGRAM:NITROGEN SUPPLY SYSTEM." (1 page(s), 3/13/1990)
- ML20261A372 - "PIPING & INSTRUMENT DIAGRAM:SERVICE WATER PUMPS AND SECONDARY SERVICE WATER SYSTEM," as-built. (1 page(s), 9/25/1989)
- ML20261A280 - "PIPING & INSTRUMENT DIAGRAM:DECAY HEAT TRAIN 2," as-built. (1 page(s), 2/1/1990)
- ML20012E026 - "Second 10-Yr Interval Pump & Valve Inservice Testing Program." W/37 oversize drawings. (150 page(s), 3/22/1990)
- ML20261A286 - "PIPING & INSTRUMENT DIAGRAM:SAMPLING SYSTEM SH 3." (1 page(s), 2/10/1990)
- ML20261A343 - "PIPING & INSTRUMENT DIAGRAM:MAIN STEAM AND REHEAT SYSTEM," as-built.Sheet 3. (1 page(s), 2/1/1990)
- ML20261A367 - "PIPING & INSTRUMENT DIAGRAM:STEAM GENERATOR SECONDARY SYSTEM," as-built. (1 page(s), 11/6/1989)
- ML20261A521 - "PIPING & INSTRUMENT DIAGRAM:GASEOUS RADIOACTIVE WASTE SYSTEM," as-built. (1 page(s), 1/3/1990)
- ML20261A312 - "PIPING & INSTRUMENT DIAGRAM:MAKE UP & PURIFICATION SYSTEM," as-built. (1 page(s), 11/30/1989)
- ML20261A394 - "PIPING & INSTRUMENT DIAGRAM:COMPONENT COOLING WATER SYSTEM." (1 page(s), 3/13/1990)
- ML20261A254 - "PIPING & INSTRUMENT DIAGRAM:DECAY HEAT TRAIN 1," as-built. (1 page(s), 2/1/1990)
- ML20261A512 - "PIPING & INSTRUMENTATION DIAGRAM:STATION AIR SYSTEM." (1 page(s), 2/6/1990)
- ML20261A525 - "PIPING & INSTRUMENT DIAGRAM:GASEOUS RADIOACTIVE WASTE SYSTEM," as-built.Rev date illegible. (1 page(s), 3/22/1990)
- ML20261A431 - "P&ID - HV & A/C AIR FLOW DIAGRAM:CONTAINMENT AND PENETRATION ROOMS," as-built.Sheet 1.Rev date illegible. (1 page(s), 3/22/1990)
- ML20261A335 - "PIPING & INSTRUMENT DIAGRAM:MAIN STEAM AND REHEAT SYSTEM." Sheet 1. (1 page(s), 2/22/1990)
- ML20261A517 - "PIPING & INSTRUMENT DIAGRAM:STATION DRAINAGE SYSTEMS." Rev date illegible. (1 page(s), 3/22/1990)
- ML20261A361 - "PIPING & INSTRUMENT DIAGRAM:AUXILIARY FEEDWATER SYSTEM," as-built. (1 page(s), 12/18/1989)
- ML20261A418 - "PIPING & INSTRUMENT DIAGRAM:COMPONENT COOLING WATER SYSTEM," as-built. (1 page(s), 2/1/1990)
- ML20261A325 - "PIPING & INSTRUMENT DIAGRAM:CHEMICAL ADDITION SYSTEMS," as-built. (1 page(s), 1/10/1990)
- ML20261A426 - "PIPING & INSTRUMENT DIAGRAM:COMPONENT COOLING WATER SYSTEM," as-built.Rev date illegible. (1 page(s), 3/22/1990)
- ML20261A218 - "PIPING & INSTRUMENT DIAGRAM:REACTOR COOLANT SYSTEM," as-built. (1 page(s), 6/14/1989)
- ML20261A355 - "PIPING & INSTRUMENT DIAGRAM:STEAM GENERATOR SECONDARY SYSTEM," as-built. (1 page(s), 1/9/1990)
- ML20261A264 - "PIPING & INSTRUMENT DIAGRAM:EMERG CORE COOLING SYSTEM CTMT SPRAY & CORE FLOODING SYSTEMS," as-built. (1 page(s), 1/31/1990)
- ML20261A246 - "PIPING & INSTRUMENT DIAGRAM:REACTOR COOLANT PUMP & MOTOR," as-built. (1 page(s), 3/30/1989)
- ML20261A495 - "PIPING & INSTRUMENT DIAGRAM:INSTRUMENT AIR SYSTEM." (1 page(s), 2/27/1990)
- ML20261A296 - "PIPING & INSTRUMENT DIAGRAM:DIESEL GENERATORS AIR START." (1 page(s), 2/1/1990)
- ML20261A489 - "PIPING & INSTRUMENT DIAGRAM:MAKE-UP WATER TREATMENT SYSTEM," as-built.Rev date illegible. (1 page(s), 3/22/1990)
- ML20261A386 - "PIPING & INSTRUMENT DIAGRAM:PRIMARY SERVICE WATER SYSTEM," as-built. (1 page(s), 2/1/1990)
- ML20261A389 - "PIPING & INSTRUMENT DIAGRAM:SERVICE WATER SYSTEM FOR CONTAINMENT AIR COOLERS," as-built. (1 page(s), 2/1/1990)
- ML20261A447 - "P&ID - HV & A/C AIR FLOW DIAGRAM:CONTAINMENT AND PENETRATION ROOMS," as-built.Sheet 3. (1 page(s), 9/22/1989)
- ML20261A228 - "PIPING & INSTRUMENT DIAGRAM:REACTOR COOLANT SYSTEM DETAILS," as-built. (1 page(s), 10/13/1989)
- ML20261A439 - "P&ID - HV & A/C AIR FLOW DIAGRAM:CONTAINMENT AND PENETRATION ROOMS," as-built.Sheet 4.Rev date illegible. (1 page(s), 3/22/1990)
- ML20261A316 - "PIPING & INSTRUMENT DIAGRAM:MAKE UP & PURIFICATION SYSTEM," as-built. (1 page(s), 2/1/1990)
- ML20261A304 - "PIPING & INSTRUMENT DIAGRAM:MAKE UP & PURIFICATION SYSTEM." (1 page(s), 3/7/1990)
- ML20261A271 - "PIPING & INSTRUMENT DIAGRAM:HIGH PRESSURE INJECTION," as-built. (1 page(s), 1/31/1990)
- ML20261A473 - "P&ID - HV & A/C AIR FLOW DIAGRAM:AUX BLDG RADWASTE FUEL HANDLING AND ACCESS CONTROL AREAS," as-built. (1 page(s), 10/20/1989)