NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards final technical rept, "Edwin I Hatch Nuclear Plant Unit 2 Reactor Containment Bldg 1989 Integrated Leakage Rate Test" for Fall 1989 maint/refueling outage,per IE Notice 85-071.

Accession Number: ML20006D751

Date Released: Monday, January 20, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer