Home > NRC Library > ADAMS Public Documents
Forwards summary document for second 10-yr interval of inservice insp program for facility.Certain code determined to be impractical & relief from requirements requested per 10CFR50.55a(g)(5)(iii).
Accession Number: ML20005G641
Date Released: Wednesday, September 30, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20005G640 - Forwards summary document for second 10-yr interval of inservice insp program for facility.Certain code determined to be impractical & relief from requirements requested per 10CFR50.55a(g)(5)(iii). (34 page(s), 1/12/1990)
- ML20005G648 - Forwards Rev 0 to "ASME Section XI Pump & Valve Test Program 10-Yr Interval." Program in compliance w/1986 Edition of ASME Code. (2 page(s), 1/12/1990)
- ML20005G649 - Rev 0 to "ASME Section XI Pump & Valve Test Program Second 10-Yr Interval." W/30 oversize drawings. (98 page(s), 1/12/1990)
- ML20260K993 - "PIPING & INSTRUMENT DIAGRAM BORON MANAGEMENT SYSTEM," as-built.Sheet 1. (1 page(s), 11/14/1989)
- ML20260L056 - "PIPING & INSTRUMENT DIAGRAM SAFETY INJECTION SYSTEM," as-built. (1 page(s), 7/13/1989)
- ML20260K982 - "PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM," as-built.Sheet 3 of 3. (1 page(s), 11/11/1989)
- ML20260L040 - "PIPING & INSTRUMENT DIAGRAM REACTOR COOLANT SYSTEM," as-built.Sheet 2. (1 page(s), 11/8/1989)
- ML20260K999 - "PIPING & INSTRUMENT DIAGRAM GASEOUS RADIOACTIVE WASTE," as-built. (1 page(s), 10/20/1989)
- ML20260L020 - "PIPING & INSTRUMENT DIAGRAM BREATHING AIR SYSTEM," as-built.Sheet 5. (1 page(s), 4/21/1987)
- ML20260K973 - "PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM," as-built.Sheet 2. (1 page(s), 10/13/1989)
- ML20260L051 - "PIPING & INSTRUMENT DIAGRAM CHEMICAL & VOLUME CONTROL SYSTEM," as-built.Sheet 2 of 2. (1 page(s), 10/11/1989)
- ML20260L003 - "PIPING & INSTRUMENT DIAGRAM EMERGENCY DIESEL GENERATOR FUEL OIL SYSTEM," as-built.Sheet 1. (1 page(s), 10/31/1989)
- ML20260L033 - "PIPING & INSTRUMENT DIAGRAM CHILLED WATER SYSTEM CONTAINMENT TURBINE & AUX BLDGS," as-built.Sheet 1. (1 page(s), 10/2/1989)
- ML20260L074 - "PIPING AND INSTRUMENT DIAGRAM SAMPLING SYSTEM," as-built. Sheet 1. (1 page(s), 10/10/1989)
- ML20260K968 - "PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM," as-built.Sheet 1. (1 page(s), 10/13/1989)
- ML20260K953 - "PIPING & INSTRUMENT DIAGRAM LUBE OIL,LUBE OIL COOLING, ELECTRO/HYDRAULIC CONTROLS & MAIN STEAM," as-built.Sheet 4. (1 page(s), 4/20/1989)
- ML20260L083 - "PIPING & INSTRUMENT DIAGRAM AIR FLOW & CONTROL DIAGRAM HEATING,VENTILATING & AIR COND CONTAINMENT BUILDING," as-built." Sheet 1. (1 page(s), 11/7/1989)
- ML20260K985 - "PIPING & INSTRUMENT DIAGRAM LIQUID RADIOACTIVE WASTE SYSTEM," as-built.Sheet 1. (1 page(s), 11/3/1989)
- ML20260L017 - "PIPING & INSTRUMENT DIAGRAM INSTRUMENT AIR SYSTEM," as-built.Sheet 2. (1 page(s), 9/27/1989)
- ML20260L071 - "PIPING & INSTRUMENT DIAGRAM CONTAINMENT SPRAY SYSTEM," as-built.Sheet 2. (1 page(s), 5/19/1989)
- ML20260L024 - "PIPING & INSTRUMENTATION DIAGRAM FIRE WATER," as-built. Sheet 2. (1 page(s), 11/14/1989)
- ML20260K961 - "PIPING & INSTRUMENT DIAGRAM STEAM GENERATOR SECONDARY SYSTEM," as-built.Sheet 1 of 2. (1 page(s), 11/10/1989)
- ML20260L008 - "PIPING & INSTRUMENT DIAGRAM EMERGENCY DIESEL GENERATOR STARTING AIR SYSTEM," as-built.Sheet 2. (1 page(s), 10/31/1989)
- ML20260L065 - "PIPING & INSTRUMENT DIAGRAM CONTAINMENT SPRAY SYSTEM," as-built.Sheet 1. (1 page(s), 6/23/1989)
- ML20260L046 - "PIPING & INSTRUMENT DIAGRAM CHEMICAL & VOLUME CONTROL SYSTEM," as-built.Sheet 1 of 2. (1 page(s), 11/16/1989)
- ML20260L012 - "PIPING & INSTRUMENT DIAGRAM SERVICE AIR SYSTEM," as-built. Sheet 1. (1 page(s), 11/14/1989)
- ML20260K965 - "PIPING & INSTRUMENT DIAGRAM STEAM GENERATOR SECONDARY SYSTEM," as-built.Sheet 2 of 2. (1 page(s), 7/21/1989)
- ML20260K989 - "FLOW DIAGRAM LIQUID RADWASTE SYSTEM CONTAINMENT BUILDING," as-built.Sheet 10. (1 page(s), 3/14/1989)
- ML20260K957 - "PIPING & INSTRUMENT DIAGRAM EMERGENCY FEEDWATER," as-built. Sheet 4 of 4. (1 page(s), 8/2/1989)
- ML20260L060 - "PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING WATER SYSTEM," as-built.Sheet 1 of 2. (1 page(s), 9/26/1989)
- ML20260L078 - "PIPING & INSTRUMENT DIAGRAM NITROGEN ADDITION SYSTEM," as-built.Sheet 1. (1 page(s), 8/1/1989)
- ML20260L028 - "PIPING & INSTRUMENT DIAGRAM PLANT HEATING SYSTEM," as-built.Sheet 1. (1 page(s), 8/3/1989)
- ML20260L036 - "PIPING & INSTRUMENT DIAGRAM REACTOR COOLANT SYSTEM," as-built.Sheet 1. (1 page(s), 5/22/1989)