NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Differential Settlement Between Svc Bldg & Unit 2 Main Steam Valve Housing," technical rept prepared in response to Tech Spec requirements.No remedial action is necessary.Settlement monitoring has been increased.

Accession Number: ML20003B669

Date Released: Friday, January 17, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer