NRC Logo

Home > NRC Library > ADAMS Public Documents

Final & Interim Deficiency Rept CP-89-015 re auxiliary feedwater sys check valves backleakage.Initially reported on 890519.Rept expanded to include swing arm deficiency described in CP-89-019.

Accession Number: ML19354D646

Date Released: Friday, January 3, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer