Home > NRC Library > ADAMS Public Documents
Responds to NRC 801002 ltr requesting info re facility containment sump & thermal insulation design.Sixteen oversize drawings encl.Aperture cards in PDR.
Accession Number: ML19345E479
Date Released: Wednesday, September 30, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19351F259 - Responds to NRC 801002 ltr requesting info re facility containment sump & thermal insulation design.Sixteen oversize drawings encl.Aperture cards in PDR. (16 page(s), 1/7/1981)
- ML20260K043 - "Reactor Building-Composite Piping Floor Plan EL 697 Ft- 6 Inches." Sheet 1 of 10. (1 page(s), 1/14/1974)
- ML20260K049 - "Reactor Bldg Unit 2:Floor Drain Piping Plan at EL 697 Ft- 6 Inches." Sheet 4 of 4. (1 page(s), 1/31/1973)
- ML20260K057 - "Reactor Bldg Unit 1:Floor Drain Piping Plan at EL 697 Ft- 6 Inches." Sheet 4 of 4. (1 page(s), 12/28/1972)
- ML20260K068 - "Reactor Building Unit 2:Basement Floor at EL 697 Ft-6 Inches Concrete - Sections & Details." (1 page(s), 2/29/1972)
- ML20260K074 - "Reactor Building Unit 1:Concrete - Sections & Details." (1 page(s), 6/9/1972)
- ML19345E478 - "Reactor Bldg Unit 1:Composite Piping Section B-B." Sheet 6 of 10. (1 page(s), 1/14/1974)
- ML20260K076 - "Reactor Bldg Unit 1 Composite Piping Section D-D." Sheet 8 of 10. (1 page(s), 1/14/1974)
- ML20260K081 - "Reactor Bldg Unit 1:Composite Piping Section A-A." Sheet 5 of 10. (1 page(s), 4/17/1979)
- ML20260K089 - "Reactor Building Piping Unit 2:Composite Section B-B." Sheet 6 of 9. (1 page(s), 1/14/1974)
- ML20260K093 - "Reactor Building Piping Unit 2:Composite Sections C-C & D-D." Sheet 7 of 9. (1 page(s), 1/14/1974)
- ML20260K097 - "Reactor Building Piping Unit 2:Composite Section A-A." Sheet 5 of 9. (1 page(s), 1/14/1974)
- ML20260K109 - "Residual Heat Removal Piping,Unit 2." Sheet 1 of 3. (1 page(s), 9/2/1980)
- ML20260K113 - "Residual Heat Removal Piping,Unit 2." Sheet 2 of 3. (1 page(s), 6/14/1973)
- ML20260K116 - "Residual Heat Removal Piping,Unit 1." Sheet 2 of 3. (1 page(s), 5/4/1973)
- ML20260K120 - "Reactor Building Piping Unit 2:Composite;Plan at EL 697 Ft- 6 Inches." Sheet 1 of 9. (1 page(s), 4/17/1979)
- ML20260K124 - "Residual Heat Removal Piping Unit 1." Sheet 1 of 3. (1 page(s), 9/2/1980)