NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to 800331 ltr supporting resumption of operation at Unit 1.Public hearing scheduled for Fall 1980 to determine whether Unit 1 operation should be resumed & conditions for operation.Feasibility studies for Unit 2 underway.

Accession Number: ML19344E411

Date Released: Thursday, October 24, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer