Forwards revised LERs 80-004/03L-1 & 80-005/03L-1 & LERs 80-007/01T-0,80-008/01T-0,80-010/03L-0 & 80-011/03L-0.
Accession Number: ML19344D281
Date Released: Tuesday, December 24, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19344D280 - Forwards revised LERs 80-004/03L-1 & 80-005/03L-1 & LERs 80-007/01T-0,80-008/01T-0,80-010/03L-0 & 80-011/03L-0. (2 page(s), 3/4/1980)
- ML19344D283 - Revised 80-004/03L-1:on 800123,during routine Tech Spec review,radiation monitor setpoints found less conservative than mode 6 requirements.Caused by personnel error.Change added to mode 6 checklist. (2 page(s), 3/4/1980)
- ML19344D285 - Revised LER 80-005/03L-1:on 800112,during decontamination, waste water tank SW-TK-1 was filled & operator asked to do valving.Failure to observe Tech Spec re valving in hot spots resulted in contamination of auxiliary bldg. (2 page(s), 3/4/1980)
- ML19344D288 - ER 80-007/01T-0:on 800121,during reload after defueling, main filter banks found not in svc.Caused by procedural inadequacy because none of refueling checklists indicated Tech Spec change that required flow. (2 page(s), 3/4/1980)
- ML19344D290 - Forwards LER 80-008/01T-0. (2 page(s), 2/25/1980)
- ML19344D294 - LER 80-008/01T-0:on 800225,review conducted of as-built configuration of cable trays & conduits attached to underside of cable lateral earthquake components.Potential overstress condition found.Cause unknown. (2 page(s), 3/4/1980)
- ML19344D296 - LER 80-010/03L-0:on 800131,refueling team was given go ahead for core alterations.Fifteen minutes later,inservice boric acid transfer pump CH-P-2B tripped on thermal overload. Probably caused by faulty blender controls shifting speed. (1 page(s), 3/4/1980)
- ML19344D302 - LER 80-011/03L-0:on 800226,during boron injection flow path verification,operator stroked MOV-SI-869A connecting charge sys fill header to RCS hot leg piping.Valve opened & linestarter tripped.Caused by burnt motor in MOV-SI-869A. (2 page(s), 3/4/1980)