Home > NRC Library > ADAMS Public Documents
Ack receipt of 780503 ltr informing NRC of steps taken to correct violations noted in IE Insp Repts 50-010/78-10, 50-237/78-09 & 50-249/78-09.
Accession Number: ML19340A875
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19340A874 - Ack receipt of 780503 ltr informing NRC of steps taken to correct violations noted in IE Insp Repts 50-010/78-10, 50-237/78-09 & 50-249/78-09. (1 page(s), 6/20/1978)
- ML19340A876 - Responds to NRC 780412 ltr re violations noted in IE Insp Repts 50-010/78-10,50-237/78-09 & 50-249/78-09.Corrective action:shift supervisor 780407 meeting stressed out-of-svc procedure & responsibility for equipment status. (4 page(s), 5/3/1978)
- ML19340A878 - Forwards IE Insp Repts 50-010/78-10,50-237/78-09 & 50-249/78-09 on 780302,03,07,08,14-16,22,23,27 & 28, & notice of violation. (3 page(s), 4/12/1978)
- ML19340A881 - Notice of violation from insp on 780302,03,07,08,14-16,22 23,27 & 28. (1 page(s), 4/11/1978)
- ML19340A882 - Notice of deviation from insp on 780302,03,07,08,14-16,22, 23,27 & 28. (1 page(s), 4/11/1978)
- ML19340A884 - IE Insp Repts 50-010/78-10,50-237/78-09 & 50-249/78-09 on 780302,03,07,08,14-16,22,23,27 & 28.Noncompliance noted: heatup rate exceeded & out-of-svc card not affixed to gland seal leakoff drain pump. (17 page(s), 4/11/1978)