Home > NRC Library > ADAMS Public Documents
Forwards draft of special low power testing procedures & safety evaluation,in compliance w/NUREG-0694 fuel loading requirement.
Accession Number: ML19338F555
Date Released: Wednesday, December 18, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19338F554 - Forwards draft of special low power testing procedures & safety evaluation,in compliance w/NUREG-0694 fuel loading requirement. (1 page(s), 10/10/1980)
- ML19338F557 - Draft special low power testing procedure,TP/1/A/2150/20, "Natural Circulation Verification." (17 page(s), 10/10/1980)
- ML19338F558 - Draft special low power testing procedures,TP/1/A/2150/21, "Effect of Steam Generator Isolation on Natural Circulation." (16 page(s), 10/10/1980)
- ML19338F561 - Draft special low power testing procedures,TP/1/A/2150/23, "Natural Circulation w/Simulated Loss of Offsite Power." (11 page(s), 10/10/1980)
- ML19338F564 - Draft special low power testing procedure TP/1/A/2150/26, "Simulated Loss of All Onsite & Offsite AC Power." (10 page(s), 10/10/1980)
- ML19338F565 - "Special Low Power Tests Safety Evaluation." (47 page(s), 10/10/1980)