NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards discussion of evaporation pond contingency plan for SPRB U extraction/IX program.Forwards drawing ATW-05-C-01 of pond design showing two cells,separating dam & leak detection sys.

Accession Number: ML19336A522

Date Released: Thursday, October 24, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer