NRC Logo

Home > NRC Library > ADAMS Public Documents

Interim deficiency rept re reactor coolant pump motor flanges.B&W final design mods,substituting studs & nuts for cap screws,requires three to six wks for util review & approval.Interim or final rept will be submitted by 780831.

Accession Number: ML19329E281

Date Released: Monday, December 9, 2019

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer