Home > NRC Library > ADAMS Public Documents
Forwards 740925 util response to violations noted in Insp Rept 50-346/74-05.Response inadequate.
Accession Number: ML19329B001
Date Released: Sunday, November 8, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19329B000 - Forwards 740925 util response to violations noted in Insp Rept 50-346/74-05.Response inadequate. (1 page(s), 10/7/1974)
- ML19329B002 - Responds to AEC 740821 ltr re violations noted in Insp Rept 50-346/74-05.Corrective actions:remaining painting of containment vessel interior subj to QA requirements per Reg Guide 1.54. (9 page(s), 9/25/1974)
- ML19329B003 - Notifies of availability of AEC 740821 ltr & Insp Rept 50-346/74-05 to interested media.No proprietary info. (2 page(s), 8/28/1974)
- ML19329B004 - Forwards Insp Rept 50-346/74-05 on 740717-18.Noncompliance noted. (2 page(s), 8/21/1974)
- ML19329B005 - Insp Rept 50-346/74-05 on 740717-18.Noncompliance noted: improper organization of QA program,containment vessel interior painted w/o use of approved procedure,improper control of BC-4 insp forms & paint sys samples not provided. (15 page(s), 8/16/1974)
- ML19329B006 - Responds to 750314 memo & forwards proposed reply to Representative Mottl re containment liner paint quality problems at facility. (4 page(s), 3/19/1975)
- ML19329B007 - "Statement on Davis-Besse QA Investigation." (2 page(s), 2/21/1975)
- ML19354C290 - Forwards 750227 request from Representative Mottl.Requests response by 750320. (1 page(s), 3/14/1975)
- ML19329B008 - Forwards MW Schabitzer 750223 ltr re investigation of alleged defective matl & workmanship at facility.Requests reply. (3 page(s), 2/27/1975)