NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to 890811 ltr to B Mikulski re storage of radwaste at plant & potential for reopening of Cove Point terminal. NRC will ensure that contingency plan in effect at facility before plant reopening.

Accession Number: ML19327A748

Date Released: Sunday, November 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer