Home > NRC Library > ADAMS Public Documents
Forwards KR Goller 760120 memo to BH Grier re reactor bldg ductwork mods 740429 technical review request.Licensee corrective action adequate & addl ductwork design review unwarranted.
Accession Number: ML19326B722
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19326B721 - Forwards KR Goller 760120 memo to BH Grier re reactor bldg ductwork mods 740429 technical review request.Licensee corrective action adequate & addl ductwork design review unwarranted. (1 page(s), 1/22/1976)
- ML19326B725 - Requests technical review of facility reactor bldg ductwork mods adequacy. (1 page(s), 4/29/1974)
- ML19326B728 - Responds to 740429 technical review request re facility cooling sys design deficiency.Util 740401 rept & 740426 Addendum 1 indicate that structurally deficient ductwork redesign & mods are adequate & addl review unwarranted. (1 page(s), 1/20/1976)
- ML19326B731 - Forwards Addendum 1 to util rept on reactor bldg cool air supply ducts at facility,augmenting 740429 info.W/o encl. (1 page(s), 5/2/1974)
- ML19326B735 - Ack receipt of 740426 ltr forwarding Addendum 1 to util final rept re reactor bldg ductwork deficiency. (1 page(s), 5/2/1974)
- ML19326B738 - Forwards Addendum 1 to "Reactor Bldg Cool Air Supply Ducts Testing & Evaluation." (2 page(s), 4/26/1974)
- ML19326B741 - Addendum 1 to "Reactor Bldg Cool Air Supply Ducts Testing & Evaluation." (22 page(s), 4/30/1974)
- ML19326B747 - Ack receipt of 740401 final rept re reactor bldg ductwork deficiency. (1 page(s), 4/12/1974)
- ML19326B749 - Forwards final deficiency rept providing investigation & corrective action details re reactor bldg ductwork. Deficiency reported on 731220 & interim rept submitted on 740124.W/o encl. (2 page(s), 4/1/1974)
- ML19326B751 - Ack receipt of 740121 interim rept re reactor bldg ductwork design deficiency. (1 page(s), 2/5/1974)
- ML19326B754 - Forwards interim deficiency rept providing details re reactor bldg ductwork deficiency investigation.Deficiency reported on 731220. (1 page(s), 1/21/1974)
- ML19326B757 - Interim deficiency rept re reactor bldg cooling sys potential inability to withstand differential pressures during LOCA.Air duct structural capacity will be re-evaluated & mods completed by 740121. (1 page(s), 1/21/1974)