NRC Logo

Home > NRC Library > ADAMS Public Documents

Safety evaluation by Div of Reactor Licensing re B&W ECCS evaluation model & applicability of generic evaluation model.Evaluation of ECCS performance should be submitted within six months of refueling.

Accession Number: ML19326B385

Date Released: Friday, November 6, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer