Home > NRC Library > ADAMS Public Documents
Forwards Structural Engineering Branch evaluation of key documents re repair of facility containment dome.Dome meets original structural design criteria & will withstand conditions w/o impairment of structural integrity.
Accession Number: ML19326B243
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19326B242 - Forwards Structural Engineering Branch evaluation of key documents re repair of facility containment dome.Dome meets original structural design criteria & will withstand conditions w/o impairment of structural integrity. (1 page(s), 12/14/1976)
- ML19326B246 - Forwards safety evaluation of repaired containment structure to be used as SER suppl. (1 page(s), 11/29/1976)
- ML19326B247 - Safety evaluation suppl supporting use of repaired containment structure at facility. (4 page(s), 11/29/1976)
- ML19326B248 - Forwards pages to be incorporated into util 760611 interim rept re reactor bldg dome delamination & cover sheet for related util 761210 final rept. (4 page(s), 12/10/1976)
- ML19326B249 - Forwards revised Suppl 2 to util 761014 interim deficiency rept re reactor bldg dome delamination in response to Structural Engineering Branch request for addl info. (1 page(s), 10/28/1976)
- ML19326B250 - "Suppl 2,Responses to Structural Engineering Branch Comments & Request for Addl Info re Reactor Bldg Dome Delamination Interim Rept & Suppl 1." (8 page(s), 10/28/1976)
- ML19326B251 - Forwards pages to "Instrument Location" & "Displacement Acceptance Criteria" for use in evaluation of facility structural integrity test. (6 page(s), 10/8/1976)
- ML19326B252 - Discusses status of reactor bldg dome repair & requests exemption from structural integrity & integrated leak rate tests.Dome repair schedule encl. (4 page(s), 9/15/1976)
- ML19326B253 - Forwards amended pages to interim rept re reactor bldg dome delamination in response to 760730 request. (4 page(s), 8/16/1976)
- ML19326B254 - Forwards Suppl 1 to util 760611 interim rept re reactor bldg dome delamination in response to 760730 request. (26 page(s), 8/10/1976)
- ML19326B257 - Follows up 760707 telcon between NRC & util & forwards NRC comments & requests for info re util interim rept re reactor bldg dome delamination. (9 page(s), 7/30/1976)
- ML19326B261 - Forwards 760611 interim rept re separation in concrete of containment structure dome & requests informal meeting in Bethesda,MD on 760618.W/o encl. (2 page(s), 6/11/1976)
- ML19326B262 - Ack receipt of util 760421 ltr re separation in concrete of containment dome. (1 page(s), 5/13/1976)
- ML19326B263 - Transfers lead responsibility in apparent delamination of containment dome from IE to Office of Nuclear Reactor Regulation. (3 page(s), 5/5/1976)
- ML19326B264 - Requests transfer of lead responsibility for review of containment dome separation repair method to Licensing. Preliminary notification & util 760421 ltr to NRC encl. (1 page(s), 4/29/1976)
- ML19326B265 - PNO:on 760417,separation in reactor bldg concrete dome identified during structural integrity test preparation.Investigation planned. (1 page(s), 4/19/1976)
- ML19326B266 - Documents apparent extent of separation in concrete of containment structure dome & discusses investigation. Sketches encl. (8 page(s), 4/21/1976)