Home > NRC Library > ADAMS Public Documents
Forwards core shroud stabilizer design submittal,providing analyses & conclusions supporting implementation of facility shroud repair.GE proprietary info also encl.GE proprietary info withheld per 10CFR2.790.
Accession Number: ML19325F570
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20086E798 - Forwards core shroud stabilizer design submittal,providing analyses & conclusions supporting implementation of facility shroud repair.GE proprietary info also encl.GE proprietary info withheld per 10CFR2.790. (42 page(s), 7/3/1995)
- ML20086E812 - Rev 0 to Design Spec 25A5718, "Shroud Repair Hardware." (10 page(s), 5/17/1995)
- ML20086E814 - Rev 1 to Code Design Spec 25A5717, "Shroud Stabilizers." (8 page(s), 6/6/1995)
- ML20086E824 - Rev 0 to "Safety Evaluation for Installation of Stabilizers on EI Hatch Nuclear Plant Unit 2 Core Shroud." (24 page(s), 7/3/1995)
- ML20086E831 - Rev 0 to Fabrication Spec 25A5719, "Fabrication of Shroud Stabilizer." (11 page(s), 6/9/1995)
- ML20086E847 - Rev 0 to Field Disposition Instruction (FDI) HT2-0121-12900. FDI documents design requirements & matl required to install stabilizers for shroud horizontal welds. (6 page(s), 6/19/1995)