Home > NRC Library > ADAMS Public Documents
Forwards Insp Repts 50-269/72-05 & 50-270/72-04 on 720516-19.No noncompliance noted.
Accession Number: ML19322A740
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19322A739 - Forwards Insp Repts 50-269/72-05 & 50-270/72-04 on 720516-19.No noncompliance noted. (1 page(s), 6/21/1972)
- ML19322A745 - Insp Repts 50-269/72-05 & 50-270/72-04 on 720516-19.No noncompliance noted.Major areas inspected:QA program associated w/steam generator repairs,control of isometric drawings & documentation of preoperational activities. (8 page(s), 6/13/1972)
- ML19322A751 - Discusses Insp Repts 50-269/72-05 & 50-270/72-04 on 720516-19.No noncompliance noted.Major areas inspected:steam generator repair procedures & review of operating logs of Unit 1 & Unit 2 main steam piping nondestructive tests. (2 page(s), 6/21/1972)
- ML19322A755 - Forwards Inquiry Rept 50-269/72-06 re control rod drive defects. (1 page(s), 5/12/1972)
- ML19322A746 - Inquiry Rept 50-269/72-06 on 720514,re notification from B&W of indications of discontinuity on inside surface of control rod drive motor tube upper extensions.All motors to be returned to Diamond Power Specialty Co for repair. (2 page(s), 5/11/1972)
- ML19322A747 - Discusses Insp Repts 50-269/72-04,50-270/72-03 & 50-287/72-02 on 720418-21.No noncompliance noted.Major areas inspected:repair to Unit 1 coolant sys,fuel loading procedures & Unit 2 electrical cable installation. (2 page(s), 6/6/1972)