NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards second interim deficiency rept re cracks in reactor pressure vessel shield wall.Final rept to be submitted before 801003.Will provide addl info re repair of shield wall & corrective actions.

Accession Number: ML19320B493

Date Released: Saturday, November 30, 2019

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer