Home > NRC Library > ADAMS Public Documents
Ack receipt of Insp Rept 50-313/73-02 on 730116-19.No proprietary info.
Accession Number: ML19317H100
Date Released: Tuesday, March 2, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19317H099 - Ack receipt of Insp Rept 50-313/73-02 on 730116-19.No proprietary info. (2 page(s), 3/23/1973)
- ML19317H106 - Informs that Insp Rept 50-313/73-02 items re reactor vessel & reactor vessel internal mods referred to headquarters for evaluation.Number of thin walled motor housing tube installations to be determined during next insp. (1 page(s), 3/21/1973)
- ML19317H109 - Forwards Insp Rept 50-313/73-02 on 730116-19.No noncompliance noted. (3 page(s), 3/7/1973)
- ML19317H111 - Forwards Insp Rept 50-313/73-02 on 730116-19.No noncompliance noted. (1 page(s), 3/7/1973)
- ML19317H113 - Insp Rept 50-313/73-02 on 730116-19.No noncompliance noted. Major areas inspected:post-tensioning sys installation procedure & workmanship,in-core instrument guide evaluation, safety cabinet & cable installation engineering evaluation. (18 page(s), 3/5/1973)
- ML19317H115 - Inquiry Rept 50-313/72-30/CDR:on 721214,licensee informed AEC that error existed in engineering drawings for reactor bldg svc water cooling sys.Supply lines will be re-routed to proper cooling sys restoring complete separations. (2 page(s), 12/15/1972)
- ML19317H116 - Inquiry Rept 50-313/73-10/CDR:on 730104-05 licensee informed AEC that B&W test repts for several heats of weld filler matl used in steam generators did not indicate tensile or impact properties. (1 page(s), 1/15/1973)