NRC Logo

Home > NRC Library > ADAMS Public Documents

Requests deletion of Tech Spec 1.2.8 defining refueling period as time between normal refuelings of reactor,not to exceed 18 months w/o prior NRC approval.Forwards proposed replacement page w/remaining specs renumbered.

Accession Number: ML19312B946

Date Released: Friday, November 22, 2019

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer