NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Proprietary "Certification of Engineering Calculation," & non-proprietary TS re suppl to TS Amend renewal of SG Tube Interim Plugging Criteria for Unit 1 Cycle 8,per NRC telcon requests.

Accession Number: ML19311B289

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer