Home > NRC Library > ADAMS Public Documents
Application for amend to license NPF-35,requesting renewal of voltage based SG tube interim plugging criteria approved for Cycle 7 operation,for use during cycle 8.Nonproprietary & proprietary WCAP-13855 & WCAP-13854,per NUREG-1477 encl.
Accession Number: ML19310E867
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20057E232 - Application for amend to license NPF-35,requesting renewal of voltage based SG tube interim plugging criteria approved for Cycle 7 operation,for use during cycle 8.Nonproprietary & proprietary WCAP-13855 & WCAP-13854,per NUREG-1477 encl. (6 page(s), 10/5/1993)
- ML20057E234 - Proposed TS 3.4.5 requesting renewal of voltage based SG tube interim plugging criteria,approved for Cycle 7 operation for use during Cycle 8. (22 page(s), 10/5/1993)
- ML20057E235 - Requests that proprietary WCAP-13854, "Technical Support For Cycle 8 SG Interim Tube Plugging For Catawba,Unit 1," be withheld,per 10CFR2.790. (19 page(s), 9/28/1993)
- ML20057E238 - Nonproprietary WCAP-13855, "Technical Support For Cycle 8 SG Tube Interim Plugging Criteria For Unit 1." (104 page(s), 9/30/1993)