Home > NRC Library > ADAMS Public Documents
Forwards drawings & info re pump & valve inservice test programs,requested by NRC 761124 & 780116 ltrs.Testing will be utilized beginning 800880.
Accession Number: ML19309G231
Date Released: Wednesday, September 30, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19309G230 - Forwards drawings & info re pump & valve inservice test programs,requested by NRC 761124 & 780116 ltrs.Testing will be utilized beginning 800880. (38 page(s), 5/1/1980)
- ML20260B172 - "P&ID:Containment,Turbine,Control Room & Penetration Room Ventilation Sys." (1 page(s), 9/17/1976)
- ML20260B131 - "P&ID:Condensate & Feedwater Sys." Sheet 1 of 2. (1 page(s), 5/27/1976)
- ML20260B188 - "P&ID:Plant Heating Sys,Turbine Bldg,Hot Water Generator & Main Loop." Sheet 1. (1 page(s), 2/9/1978)
- ML20260B222 - "P&ID:Waste Gas & Miscellaneous Waste Processing Sys." (1 page(s), 5/31/1979)
- ML20260B144 - "P&ID:Svc Water Cooling Sys,Auxiliary Bldg & Containment." Sheet 2 of 2. (1 page(s), 1/31/1974)
- ML20260B196 - "P&ID:Plant Heating Sys,Svc Bldg & Intake Structure." (1 page(s), 10/23/1974)
- ML20260B164 - "P&ID:Containment,Turbine,Control Room & Penetration Room Ventilation Sys." (1 page(s), 9/17/1976)
- ML20260B234 - "P&ID:Component Cooling Sys." (1 page(s), 10/16/1978)
- ML20260B168 - "P&ID:Containment,Turbine,Control Room & Penetration Room Ventilation Sys." (1 page(s), 5/13/1976)
- ML20260B205 - "P&ID:Auxiliary Bldg & Unit 2 Waste Process Equipment & Area Drains." (1 page(s), 11/10/1978)
- ML20260B181 - "P&ID:Nitrogen Generating & Blanketing Sys." (1 page(s), 11/4/1974)
- ML20260B156 - "P&ID:Plant Fire Protection Sys." (1 page(s), 2/4/1980)
- ML20260B152 - "P&ID:Svc Water Cooling Sys,Auxiliary Bldg & Containment." Sheet 2 of 2. (1 page(s), 10/24/1978)
- ML20260B160 - "P&ID:Spent Fuel Pool Cooling & Pool Fill & Drain Sys." (1 page(s), 5/15/1979)
- ML20260B225 - "P&ID:Area & Process Radiation Monitoring Sys." (1 page(s), 2/16/1978)
- ML20260B136 - "P&ID:Condensate & Feedwater Sys." Sheet 2 of 2. (1 page(s), 2/10/1976)
- ML20260B127 - "P&ID:Main Steam & Reheat." (1 page(s), 5/7/1979)
- ML20260B184 - "P&ID:Diesel Generator Cooling Water,Starting Air & Fuel & Lubrication Oil Sys." (1 page(s), 9/11/1978)
- ML20260B200 - "P&ID:Auxiliary Bldg & Unit 1 Waste Process Equipment & Area Drains." Sheet 1 of 3. (1 page(s), 5/18/1979)
- ML20260B217 - "P&ID:Reactor Coolant Waste Processing Sys." Sheet 2 of 2. (1 page(s), 11/27/1979)
- ML20260B251 - "P&ID:Plant Water & Air Svc Sys Stations." Sheet 1 of 2. (1 page(s), 5/9/1979)
- ML20260B140 - "P&ID:Svc Water Cooling Sys,Turbine Water." Sheet 1 of 2. (1 page(s), 8/29/1978)
- ML20260B229 - "P&ID:Circulating Salt Water Cooling Sys." (1 page(s), 9/21/1976)
- ML20260B122 - "P&ID:Chemical & Vol Control Sys." (1 page(s), 6/1/1979)
- ML20260B176 - "P&ID:Reactor Coolant & Waste Process Sample Sys." (1 page(s), 12/9/1974)
- ML20260B259 - "P&ID:Gas Analyzing Sys." (1 page(s), 10/18/1976)
- ML20260B238 - "P&ID:Containment Charcoal Filter Water Spray Sys." (1 page(s), 5/23/1975)
- ML20260B193 - "P&ID:Plant Heating Sys,Auxiliary Bldg & Containment." (1 page(s), 8/24/1978)
- ML20260B255 - "P&ID:Plant Water & Air Svc Sys Stations." Sheet 2 of 2. (1 page(s), 9/25/1978)
- ML20260B210 - "P&ID:Miscellaneous Drain & Sump Piping." Sheet 3 of 3. (1 page(s), 8/30/1978)
- ML20260B263 - "P&ID:Safety Injection & Containment Spray Sys." (1 page(s), 2/7/1980)
- ML20260B242 - "P&ID:Compressed Air Sys." (1 page(s), 11/28/1978)
- ML20260B247 - "P&ID:Reactor Coolant Sys." (1 page(s), 9/28/1977)
- ML20260B212 - "P&ID:Reactor Coolant Waste Processing Sys." Sheet 1 of 2. (1 page(s), 5/30/1979)
- ML20260B148 - "P&ID:Svc Water Cooling Sys,Turbine Area." Sheet 1 of 2. (1 page(s), 3/22/1977)