NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Ofc of Nuclear Reactor Regulation 800404 order requiring that testing be performed within 90 effective full power days.Health & safety will not be endangered by continued operation.

Accession Number: ML19305E133

Date Released: Sunday, November 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer