Home > NRC Library > ADAMS Public Documents
Ack receipt of 800303,0201 & 791220 ltrs informing NRC of steps taken to correct deviation noted in QA Program Insp Rept 99900047/79-02.
Accession Number: ML19305D056
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19305D055 - Ack receipt of 800303,0201 & 791220 ltrs informing NRC of steps taken to correct deviation noted in QA Program Insp Rept 99900047/79-02. (1 page(s), 3/24/1980)
- ML19305D059 - Responds to NRC 800219 ltr requesting addl info re deviation noted in QA Program Insp Rept 99900047/79-02.Corrective actions:appropriate instructions have been forwarded to storeroom attendants re welding electrodes & log sheets. (4 page(s), 3/3/1980)
- ML19305D061 - Ack receipt of 800201 ltr informing NRC of steps taken to correct deviation noted in QA Program Insp Rept 99900047/ 79-02.Addl info required. (1 page(s), 2/19/1980)
- ML19305D063 - Responds to NRC 800116 ltr requesting addl info re deviation noted in QA Program Insp Rept 99900047/79-02.Corrective actions:storeroom attendants were reinstructed as to procedural requirements & importance of compliance. (2 page(s), 2/1/1980)
- ML19305D071 - Ack receipt of 791220 ltr informing NRC of steps taken to correct deviations noted in QA Program Insp Rept 99900047/ 79-02.Addl info required. (2 page(s), 1/16/1980)
- ML19305D075 - Responds to NRC 791115 ltr re deviation noted in QA Program Insp Rept 99900047/79-02.Corrective actions:importance of compliance re storeroom activities was reiterated to all personnel & unit manager will review log sheets daily. (7 page(s), 12/20/1979)
- ML19305D076 - Forwards QA Program Insp Rept 99900047/79-02 on 791015-19 & notice of deviation. (2 page(s), 11/15/1979)
- ML19305D078 - Notice of deviation from insp on 791015-19. (3 page(s), 11/15/1979)
- ML19305D081 - QA Program Insp Rept 99900047/79-02 on 791015-19. Noncompliance noted:storage practices for electrodes not in accordance w/required procedures,absence of mechanical test data & failure to prepare MRR before weld repairs. (18 page(s), 11/15/1979)