Home > NRC Library > ADAMS Public Documents
Ack receipt of 791019,1115 & 1231 ltrs informing NRC of steps taken to correct deviations noted in QA Program Insp Rept 99900376/79-01.
Accession Number: ML19296B650
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19296B649 - Ack receipt of 791019,1115 & 1231 ltrs informing NRC of steps taken to correct deviations noted in QA Program Insp Rept 99900376/79-01. (1 page(s), 2/5/1980)
- ML19296B652 - Responds to NRC 791214 ltr re deviation noted in QA Program Insp Rept 99900376/79-01.Corrective actions:red tag equipment taken to calibr lab for repair &/or Calibr. Equipment found unrepairable held in QC bonded area. (1 page(s), 12/31/1979)
- ML19296B654 - Ack receipt of 791019 & 1115 ltrs re deviations noted in QA Program Insp Rept 99900376/79-01.Requests addl info concerning red tagged equipment for calibr. (1 page(s), 12/14/1979)
- ML19296B659 - Responds to NRC 790921 ltr re deviation noted in QA Insp Rept 99900376/79-01.Corrective actions:revised receiving insp log sheets will be used,record cards & calibr labels have been corrected & Drawing 30-02906 has been revised. (4 page(s), 10/19/1979)
- ML19296B660 - Forwards QA Program Insp Rept 99900376/79-01 on 790821-23 & notice of deviation. (2 page(s), 9/21/1979)
- ML19296B661 - Notice of deviation from insp on 790821-23. (5 page(s), 9/19/1979)
- ML19296B663 - QA Program Insp Rept 99900376/79-01 on 790821-23. Noncompliance noted:receiving insp log did not have lot & sample size noted,failure to keep calibr schedules & equipment in order & failure to approve drawing revision. (9 page(s), 9/19/1979)