Forwards interim rept of investigation into allegations re certain pipe fittings & valves at plant as of 690416.J Flora 690417 ltr to RT Carlson suggesting recommendations to AEC position also encl.
Accession Number: ML19289B321
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20084B988 - Submits suggested draft of final portion of interim rept on investigation into pipe quality at plant.Recommends review of test results on installed pipe & fittings or samples as verification into pipe serviceability. (4 page(s), 4/17/1969)
- ML20084B990 - Investigation rept on 690228-0416.Major areas investigated: allegations that piping,fittings & valves do not meet ASTM, ASME or AE specs. (17 page(s), 4/25/1969)
- ML20084B994 - Advises of status re piping problem at JCP&L reactor facility & repair & test program progress w/NS SAVANNAH per RH Engelken 690401 memo. (1 page(s), 4/22/1969)
- ML20084B997 - Forwards summary list of general complaints received on piping at reactor facility in response to 690404 request. Each item given verbatim by J Flora on 690318 to util & Burns & Roe. (2 page(s), 4/11/1969)
- ML20084C000 - Requests review of numerous arc strikes at reactor facilities under const.Existence of adequate program for repairing arc strikes prior to attachment of insulation should be verified. (1 page(s), 4/11/1969)
- ML20084C007 - Forwards list of complaints re plant matls & equipment in accordance w/discussions at 690407 meeting. (2 page(s), 4/8/1969)
- ML20084C017 - Lists observations re six test repts supplied by WO Strong of Alloy Tube & Pipe Corp offered as confirmation of acceptability of pipe supplied by firm.Repts are for plate from which pipe made & not for pipe. (2 page(s), 4/7/1969)
- ML20084C023 - Forwards R Gustafson 690326 trip rept to facility on 690318-21 for piping investigation. (1 page(s), 4/4/1969)
- ML20084C027 - Trip rept of 690318-21 visit to facility re insp of stainless steel piping used in various reactor sys. (18 page(s), 3/26/1969)
- ML20084C053 - Forwards "Metallurgical Exam & Review of Casting Defects in Stainless Steel Valves Bodies ..," "Evaluation of Welding & Insp Techniques..." & "Rept of Participation in Intensive QA Audit by Region III,Div of Compliance..." W/o repts. (1 page(s), 3/22/1969)
- ML20084C073 - Forwards Div of Compliance notification of alleged deficiencies made re unacceptable piping & valves at facility. (4 page(s), 3/19/1969)
- ML20084C079 - Ack receipt of 690221 ltr re allegations made by PIPECO Steel Corp officials about piping at facility. (1 page(s), 3/4/1969)
- ML20084C087 - Inquiry Memo 219/69-A re telcon w/AA Cella of PIPECO Steel Corp to obtain more specific info concerning alleged quality deficiencies noted in encl RP Kandle of JCAE 690228 ltr to AEC. (2 page(s), 2/28/1969)
- ML20084C097 - Advises of 690213 meeting w/officers of PIPECO Steel Corp who refused to supply pipe for use at Oyster Creek due to inappropriate specs.Use of filler also objectionable & led to unallowable quality reduction. (1 page(s), 2/21/1969)