Third response to FOIA request for five categories of documents.Forwards Apps A & B documents.Documents also available in PDR.
Accession Number: ML19277F284
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20102A429 - Third response to FOIA request for five categories of documents.Forwards Apps A & B documents.Documents also available in PDR. (4 page(s), 8/16/1984)
- ML20105C555 - Informs that Westinghouse application for preliminary design assessment of RESAR SP/90 significantly deficient in area of QA,in response to 831107 request.Ongoing design work should be controlled per 10CFR50,App B. (2 page(s), 11/16/1983)
- ML20105C672 - Forwards info re review of "Westinghouse Advanced PWR Preliminary Ref Std Plant Primary Side Safeguards & Module." Initial module submitted erroneous.Lack of acceptable QA on documents noted. (22 page(s), 12/30/1983)
- ML20105B988 - Comments on Westinghouse Advanced PWR design Inappropriate to provide SER on instrumentation & control sys of primary side safeguards module design since level of detail will be provided in rept. (1 page(s), 6/29/1983)
- ML19303C000 - Submits list of discrepancies between design depicted in layout drawings & in SAR for Westinghouse Advanced PWR RESAR-SP/90.Layout drawing quality too poor for further use in evaluations. (3 page(s), 3/12/1984)
- ML20105D007 - Submits list of discrepancies between design depicted in layout drawings & in SAR for Westinghouse Advanced PWR RESAR-SP/90.Layout drawing quality too poor for further use in evaluations. (3 page(s), 3/12/1984)
- ML20102A531 - Advises that Div of Sys Integration has insufficent funds to complete review of Westinghouse preliminary design approval for RESAR SP/90,based on FY84 program plan. (1 page(s), 12/19/1983)
- ML19277F283 - Discusses review for RESAR SP/90 application for preliminary design approval & schedule for module submittal.Schedule should be revised to accomodate specific review requirements. (1 page(s), 11/18/1983)
- ML20105B893 - Advises that WC Lyons assigned to Westinghouse advanced PWR reviews.Acceptance-type review can be accomplished within 1 month of receipt of final version of Module 1.SER not needed. (2 page(s), 6/21/1983)
- ML20105C342 - Outlines NRC approach for review of Westinghouse advanced PWR primary sides safeguards sys module.Design still evolving. (4 page(s), 10/18/1983)
- ML20105C578 - Forwards comments re acceptance review of Westinghouse preliminary design approval application for RESAR SP/90. Application acceptable for docketing,w/cautions identified in encl. (4 page(s), 11/29/1983)
- ML20102A467 - Requests that NRC reconsider position re future role of preliminary design approval (PDA) application requirements. PDA considered incentive for new programs in industry & accreditation important to marketing aspect. (2 page(s), 2/9/1984)
- ML20105C628 - Informs of review of RESAR SP/90 PDA application.Applicant should clarify when initial test program description will be submitted. (2 page(s), 12/12/1983)
- ML20105B727 - Summarizes 830420 meeting w/Westinghouse re proposed modular SAR format for Westinghouse advanced PWR project. (2 page(s), 5/3/1983)
- ML20105C565 - Submits findings of acceptance review of Westinghouse RESAR SP/90 application,in response to 831107 memo. Submittal dates for Modes 1 & 9 acceptable. (1 page(s), 11/22/1983)
- ML20105B994 - Requests assistance in performing preliminary evaluation of Westinghouse Advanced PWR primary side safeguards sys module to determine if NRC can review module for conformance w/SRP. (3 page(s), 6/27/1983)
- ML20105C163 - Forwards branch input to preliminary evaluation of Westinghouse advanced PWR design.Review of containment spray sys deferred until review of containment sys module. (4 page(s), 7/11/1983)
- ML20105C587 - Provides response to 831107 request for acceptance review of RESAR SP/90 Module 1.SER will provide conclusions when sufficient info provided by Westinghouse. (5 page(s), 12/1/1983)
- ML20102A658 - Advises of 831118 meeting to discuss ongoing acceptance review of Westinghouse RESAR SP/90. (1 page(s), 11/16/1983)
- ML19277F288 - Informs of completion of acceptance review for future model submittal schedule & SAR table of contents for RESAR SP/90. (3 page(s), 11/22/1983)