Home > NRC Library > ADAMS Public Documents
Notifies that Med Ed found no proprietary info in encl insp repts.
Accession Number: ML19276H275
Date Released: Friday, November 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19276H274 - Notifies that Med Ed found no proprietary info in encl insp repts. (2 page(s), 7/20/1973)
- ML19276H277 - Forwards TMI-1 insp repts requested under FOIA.Any proprietary info should be noted. (2 page(s), 7/10/1973)
- ML19276H281 - Inquiry Repts 50-289/72-03 & 50-320/72-01:on 720621-22, Susquehanna River flooded,threatening power cutoff to TMI, damaging equipment & flooding access roads.Water found in one decay heat vault.Reactor bldg not flooded. (2 page(s), 6/23/1972)
- ML19276H285 - Insp Rept 50-289/71-01 on 710118-19.Noncompliance noted: concrete poured when temp below 32 F & fire occurred on 710119 destroying six temporary bldgs.No injuries reported, no equipment damaged. (11 page(s), 2/6/1971)
- ML19276H290 - Insp Rept 50-289/72-15 on 720921-22.No noncompliance noted. Areas inspected:health physics & chemistry,radiation monitoring sys calibr,bioassay program & radiochemistry QA procedures. (6 page(s), 10/13/1972)
- ML19276H293 - Insp Rept 50-289/72-13 720802-04.No noncompliance noted. Areas inspected:mgt review,preoperational testing,facility procedures,emergency procedures & post-erection cleanup. (12 page(s), 10/13/1972)
- ML19276H296 - Insp Rept 50-289/72-05 on 720320-22.Deficiencies noted: procedures for loss of instrument air contain no provisions for signatures of approving personnel & documents do not provide for licensee response to actions. (9 page(s), 5/3/1972)
- ML19276H298 - Insp Rept 50-289/71-03 on 710624-25.Noncompliance noted: failure of vendor to supply complete matl & fabrication records for piping spools in Class N-1 sys & concrete poured at temp below 32 F. (11 page(s), 7/29/1971)
- ML19276H301 - Insp Rept 50-289/71-02 on 710405-08.Noncompliance noted: Gilbert Associates,Inc drawing S-211-002 incorrectly states that computer selects path between start & end trays,print circuit route summary & pull slips. (14 page(s), 4/29/1971)
- ML19276H304 - Insp Rept 50-289/70-07 on 701008-09.No noncompliance noted. Areas inspected:reactor vessel support,concrete QA sys & first insp of reactor vessel since storage insp on 700925. (4 page(s), 10/30/1970)
- ML19276H308 - Insp Rept 50-289/70-06 on 700426-28.Noncompliance noted: contractor for nondestructive testing of pipe welds does not meet FSAR insp requirements of makeup,purification & decay heat sys. (9 page(s), 9/25/1970)
- ML19276H313 - Insp Rept 50-289/70-04 on 700526-28.Noncompliance noted: concrete not prepared according to ACI specs.Change in brand of cement not accompanied by concrete design change. (13 page(s), 7/24/1970)
- ML19276H315 - Insp Rept 50-289/69-05 on 691103-05.No noncompliance noted. Major areas inspected:audit records & work progress.Primary insp responsibility transferred to FS Cantrell. (11 page(s), 12/10/1969)
- ML19276H317 - Insp Rept 50-289/69-04 on 690723-25.Noncompliance noted: inconsistencies in PSAR re line size from sump in reactor bldg to spray & decay heat removal pumps.Variations satisfactorily explained by vendor. (7 page(s), 9/4/1969)
- ML19276H320 - Insp Rept 50-289/69-03 on 690516.No noncompliance noted. Major areas inspected:reactor bleed tanks,coolant piping & QA for policy,matl,drawings,welds,electrodes & nondestructive tests & documentation. (4 page(s), 6/16/1969)
- ML19276H322 - Insp Rept 50-289/69-02 on 690408-10.Noncompliance noted: failure to qualify welders per Section III of ASME code & bulging of reactor bleed tank head at junction w/side walls. (13 page(s), 5/7/1969)
- ML19276H324 - Insp Rept 50-289/69-01 on 690107.No noncompliance noted. Major areas inspected:tendon gallery concrete forms,matl & welding procedures for liner plate & plant piping. (13 page(s), 1/29/1969)
- ML19276H326 - IE Insp Rept 50-289/68-02 on 680918-19.No noncompliance noted.Major areas inspected:procedures for preoperational testing,Gilbert Associates Inc QA program for const & trumpets for containment base. (10 page(s), 10/18/1968)
- ML19276H329 - IE Insp Rept 50-289/68-01 on 680822.No noncompliance noted. Major areas inspected:compliance insp program including inspector responsibility,regional ofc responsibility & insp program scope. (4 page(s), 9/4/1968)