Ack receipt of 781227 & 790123 ltrs informing NRC of steps taken to correct deviations noted in QA Program Insp Rept 99900286/78-02.
Accession Number: ML19276E793
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19276E792 - Ack receipt of 781227 & 790123 ltrs informing NRC of steps taken to correct deviations noted in QA Program Insp Rept 99900286/78-02. (1 page(s), 2/6/1979)
- ML19276E795 - Responds to NRC 790111 ltr requesting addl info re measures taken to correct deviations noted in QA Program Insp Rept 99900286/78-02.Corrects errors in 781227 ltr.Gas metal arc welding procedure entered in pump pedestals records. (1 page(s), 1/23/1979)
- ML19276E799 - Ack receipt of 781227 ltr informing NRC of steps taken to correct deviations noted in QA Program Insp Rept 99900286/78-02.Requests addl info re gas metal arc welding procedure. (1 page(s), 1/11/1979)
- ML19276E801 - Responds to NRC 781113 ltr re deviation noted in QA Program Insp Rept 99900286/78-02.Corrective actions:std operation sheet for cylinder 927757 reviewed,heat treatment reviewed, QA Manual Section 3 revised & procedures checked. (12 page(s), 12/27/1978)
- ML19276E802 - Forwards QA Program Insp Rept 99900286/78-02 & notice of deviation. (2 page(s), 11/13/1978)
- ML19276E803 - Notice of deviation from insp on 781023-27. (5 page(s), 11/13/1978)
- ML19276E805 - QA Program Insp Rept 99900286/78-02 on 781023-27. Noncompliance noted:failure by inspectors to indicate completion of insp,failure to record work in QA log failure of subcontractor to heat treat matl & purchase order defects (12 page(s), 11/13/1978)