Home > NRC Library > ADAMS Public Documents
Ack receipt 791106 & 0808 ltrs informing NRC of steps taken to correct deviation noted in QA Program Insp Rept 99900036/79-02.
Accession Number: ML19269F414
Date Released: Friday, October 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19269F413 - Ack receipt 791106 & 0808 ltrs informing NRC of steps taken to correct deviation noted in QA Program Insp Rept 99900036/79-02. (1 page(s), 11/29/1979)
- ML19269F425 - Responds to NRC 791029 ltr re deviation noted in QA Program Insp Rept 99900036/79-02.Corrective actions:documented detail rept of insp findings forwarded to CNO managers & supervisors requesting written corrective action responses. (1 page(s), 11/6/1979)
- ML19269F428 - Ack receipt of 791008 ltr informing NRC of steps taken to correct deviation noted in QA Program Insp Rept 99900036/79-02.Requests addl info re documentation of instructions,re-instructions & personnel discussions. (1 page(s), 10/29/1979)
- ML19269F430 - Responds to NRC 790906 ltr re deviation noted in QA Program Insp Rept 99900036/79-02.Corrective actions:tie straps re-welded per welding procedures & unidentified alignment & tie strap material,welded to vessel assemblies,removed. (6 page(s), 10/8/1979)
- ML19269F437 - Forwards QA Program Insp Rept 99900036/79-02 on 790813-17 & notice of deviation. (2 page(s), 9/6/1979)
- ML19269F438 - Notice of deviation from insp on 790813-17. (3 page(s), 9/5/1979)
- ML19269F443 - QA Program Insp Rept 99900036/79-02 on 790813-17. Noncompliance noted:welding being performed contrary to procedures & unidentified alignment & tie strap material found welded to vessel assemblies. (12 page(s), 9/5/1979)