NRC Logo

Home > NRC Library > ADAMS Public Documents

B&W site inspector daily rept on 790414.Plant status:Unit 2 operating at 82% power,Units 1 & 3 at full power.No major maint scheduled & all major equipment is operational.

Accession Number: ML19269E662

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer