NRC Logo

Home > NRC Library > ADAMS Public Documents

Requests exemption from GDC 4 to apply leak before break concept to eliminate postulated pipe breaks in Class 1 accumulator injection lines from structural design basis. Basis provided in WCAP-10537.Rept withheld (ref 10CFR2.790).

Accession Number: ML19269A286

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer