NRC Logo

Home > NRC Library > ADAMS Public Documents

Notification of contract execution: "Finalization of Rept on Evaluation of Cost Effects on Nuclear Power Plant Const Resulting From Increase in Seismic Design Levels," awarded to Woodward-Clyde Consultants.

Accession Number: ML19268B906

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer