Further response to FOIA request re listed info & response to appeal re lack of response to FOIA request.Forwards Apps E & F documents.Documents available in PDR.App F documents partially/completely withheld (ref FOIA Exemptions 5,6 & 7).
Accession Number: ML19263A633
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20128G376 - Further response to FOIA request re listed info & response to appeal re lack of response to FOIA request.Forwards Apps E & F documents.Documents available in PDR.App F documents partially/completely withheld (ref FOIA Exemptions 5,6 & 7). (11 page(s), 3/1/1985)
- ML20128G592 - SSER input re potential flooding of cooling tower areas. Requirements of GDC 2 met.Related info encl. (7 page(s), 6/3/1982)
- ML20128G899 - "Evaluation of Concrete in Basemat,Waterford Unit Number 3." (26 page(s), 5/7/1984)
- ML20128G873 - Forwards "Evaluation of Concrete in Basemat,Waterford Unit Number 3," based on observation of record during 840430-0504. (1 page(s), 5/7/1984)
- ML20127C060 - "Allowable Mat Bearing Pressure." (10 page(s), 4/30/1977)
- ML20128G920 - Forwards "Evaluation of Concrete in Basemat,Waterford Unit Number 3." Despite violations of spec requirements during initial concrete pouring,const adequate to ensure structural safety. (21 page(s), 5/21/1984)
- ML20127A144 - Summary of 820210 meeting w/util re open SER item concerning flooding in cooling tower areas. (7 page(s), 2/18/1982)
- ML20127A837 - Highlights status of base mat crack allegations. (2 page(s), 8/12/1983)
- ML20128G691 - Handwritten request for assessment of possible rebar performance degradation & possible control measures.Forwards matls re corrosion effect upon rebar performance.Assessment must be available by 840413. (45 page(s), 4/2/1984)
- ML19263A632 - Requests that program to be established will not cause basemat issue to become pacing item.Permits use of all available means to effect objective. (1 page(s), 3/31/1984)
- ML20128G710 - Handwritten request for review of encl first draft of structural safety evaluation.Proposes 840423 meeting for paragraph by paragraph discussion to finish draft. (22 page(s), 4/19/1984)
- ML20127A168 - Forwards SER input to Suppl 4 re problem of potential flooding of safety-related equipment in cooling tower areas. Input addresses only outstanding item & completes safety evaluation. (2 page(s), 6/3/1982)
- ML20128G826 - "Geotechnical Engineering Evaluation of Concrete Cracking in Basemat." (11 page(s), 5/21/1984)
- ML20128G773 - "Review of Waterford III Basemat Analysis." (12 page(s), 4/16/1984)
- ML20128G767 - Handwritten memo forwarding revised draft evaluation of structural adequacy & safety evaluation.Requests decision re NDT as recommended in revised draft.Related matls encl. (37 page(s), 4/24/1984)
- ML20127B613 - Forwards evaluation rept re foundation settlement based on info obtained during 840321,26 & 27 meetings & 840327 site visit.Foundation design acceptable.Summary of subsurface soil conditions encl. (13 page(s), 5/1/1984)
- ML20127A834 - Forwards draft response to Congressman Long re base mat problem in response to Action Control Item 13324.IE concurs w/draft response. (10 page(s), 8/5/1983)