NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards SER input re operator actions necessary to ensure adequate supply of cooling water for reactor core in event of double-ended break in one of two lines connecting core flood tank to reactor vessel.

Accession Number: ML19261E977

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer