NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to 780911 request for info on status of GETR.GE is conducting a fault investigation,will take 2 months before NRC can produce safety evaluation & another month before show cause issues go before ASLB.

Accession Number: ML19261A240

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer