NRC Logo

Home > NRC Library > ADAMS Public Documents

Requests post-const IE insp of lifts recently placed on tailings retention immpoundments.Criteria being developed for use in insp module on tailings dam.Checklist for embankment post-const insps & related correspondence encl.

Accession Number: ML19257D739

Date Released: Friday, October 25, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer