NRC Logo

Home > NRC Library > ADAMS Public Documents

Discusses integrated leakage rate test schedule at facility. Resommends util perform Type A test within 12 months of 1977 test & more frequent Type B & C testing.Forwards IE Insp Rept 50-289/77-11.

Accession Number: ML19256D714

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer